dima
  • Huawei R&D Masterplan

    Phase II of the project is an evolution from an existing Phase I design on the R&D site. Special programmatic buildings are positioned to create epicenters shared by both phases. In contrast to Phase I’s designed lake, Phase II introduces a natural water edge to the masterplan. The masterplan is composed of a single modular building which situates itself into 3 clusters throughout the site. The composition of the 3 research clusters create a unique interstitial relationship to its natural environment. Each new building module houses both office and laboratory program which are intertwined with an efficient loop circulation system. Role_Concept, Design, Masterplan, Communication, Production (all images courtesy of HENN, Finalist)